Home » Impact » Future-proof and climate adaptive

Future-proof and climate adaptive

Projects

View all projects
Shell C30 renovatie

Shell campus: sustainability and renovation C30

Shell campus: sustainability and renovation C30

The C30 building is a national monument of 25,000m² GLA. The original building dates back to 1916, the extensions to 1928 and 1929. Originally part of Shell's headquarters, it is now part of the Shell Campus The Hague. Between 2018 and 2022, the building was renovated and made more sustainable. An intensive process requiring a high level of ambition. Throughout the implementation process, ABT served as Architect of Record for Shell.
Climate adaptation at The Natural Pavilion

The Natural Pavilion

The Natural Pavilion

In The Natural Pavilion, ABT and a consortium of nearly 20 Dutch companies have shown that it is possible to build fully circular, bio-based, energy-neutral houses, schools and offices on an industrial scale and in close connection with nature.
Franciscus Gasthuis & Vlietland

Franciscus Gasthuis & Vlietland

Franciscus Gasthuis & Vlietland

Franciscus Gasthuis & Vlietland has started the construction of a new, sustainable, and energy-efficient hospital building next to the current Franciscus Gasthuis. The new building, which will open in 2026, facilitates healthcare innovation and is more compact, flexible, and sustainable. ABT is involved in many areas as an advisor: in geotechnics, structures, project management, building physics and acoustics, and coordination of monitoring.

Dike reinforcement City of Tiel

Dike reinforcement City of Tiel

A puzzle of piles, anchors, and forces! This is how you can describe the sheet pile wall construction of section 3B (DT3B) in the City of Tiel. To better protect the city of Tiel against high water, the dike between the Amsterdam-Rhine Canal and the Inundation Canal is being structurally reinforced. On behalf of FPH Ploegmakers, ABT developed the engineering of this project into an implementation design.

WRZV sports halls

WRZV sports halls

Maximal circularity and sustainability, and the lowest possible environmental impact. These were the goals during the development of the WRZV sports halls. ABT, commissioned by the municipality of Zwolle, worked with an integrated team on these sports halls. The team included experts in structural engineering, geotechnics, building services, building physics, and fire safety. During the execution, ABT conducted various quality inspections.

Sportcampus Zuiderpark

Sportcampus Zuiderpark

On the site of the former ADO Den Haag football stadium, the Sportcampus Zuiderpark has been built. The building includes, among other things, a top sports hall, a double-width sports hall, a gymnastics hall, and classrooms for The Hague University of Applied Sciences and ROC Mondriaan.

Erasmus Medisch Centrum

Erasmus Medisch Centrum

For more than 8 years, extensive efforts have been made on the new state-of-the-art university hospital with an area of 207,000 m². On the site of the existing hospital, a completely new Erasmus MC has been realized where care, research, and education come together. ABT worked as the technical designer on behalf of EGM architects bv and was responsible for construction management.
Drie collega's in gesprek bij het koffiezetapparaat; samen van visie naar ontwerprichting

What project can we realize for you?

Contact