Projects with very high ambitions in terms of impact, sustainability and quality are the projects where we can make the difference. We have the technical skills, innovation power, process knowledge and, through the Oosterhoff network, quick access to additional expertise. This enables us to realise complex, unique assignments successfully and be ambitious together with clients and partners. Why not check out some highlights from our portfolio here!
Tergooi
Hilversum

Tergooi MC

Tergooi MC

A hospital for the entire Gooi- and Vecht region, that is the new central hospital and associated Tergooi MC Clinics in Hilversum. In 2023, the current hospitals of Blaricum and Hilversum will move to the new hospital. ABT is responsible for contract management, project management, management direction and supervision.
Arnhem

Renovation Museum Arnhem

Renovation Museum Arnhem

Museum Arnhem temporarily closed its doors in 2017 for a large-scale renovation. The museum was partially demolished, partially renovated and new construction took place. The new building involved one above-ground level and two underground levels (three in total). ABT provided the implementation design for the museum's structure and foundation.
Amsterdam

Jakoba Mulderhuis

Jakoba Mulderhuis

The future-proof and sustainable Jakoba Mulder House of the Amsterdam College Hogeschool van Amsterdam (HvA) is the final piece of the Amstel Campus. This new building will accommodate 6,000 to 7,000 students from the Faculty of Engineering and include about 25,000 square meters of educational program. ABT, along with BREED Integrated Design, provided the structural design and was responsible for geotechnical consulting.
Shell C30 renovatie
The Hague

Shell campus: sustainability and renovation C30

Shell campus: sustainability and renovation C30

The C30 building is a national monument of 25,000m² GLA. The original building dates back to 1916, the extensions to 1928 and 1929. Originally part of Shell's headquarters, it is now part of the Shell Campus The Hague. Between 2018 and 2022, the building was renovated and made more sustainable. An intensive process requiring a high level of ambition. Throughout the implementation process, ABT served as Architect of Record for Shell.
Renovatie Huis van Roosendaal
Roosendaal

Renovation HUIS van Roosendaal

Renovation HUIS van Roosendaal

The municipality of Roosendaal wants to demonstrate that it stands for a ‘green’ municipality. The much-needed renovation of the existing city hall from the 1970s was the perfect opportunity to pull out all the stops and showcase this green ambition. The end result is an accessible, transparent, and above all, sustainable HOUSE of Roosendaal.
Tiel

Dike reinforcement City of Tiel

Dike reinforcement City of Tiel

A puzzle of piles, anchors, and forces! This is how you can describe the sheet pile wall construction of section 3B (DT3B) in the City of Tiel. To better protect the city of Tiel against high water, the dike between the Amsterdam-Rhine Canal and the Inundation Canal is being structurally reinforced. On behalf of FPH Ploegmakers, ABT developed the engineering of this project into an implementation design.
Breda

Amphia Hospital

Amphia Hospital

The Amphia Hospital in Breda received the key to the new building location at Molengracht in 2021. ABT advised on the construction, foundation, and excavation, and monitored the structural construction costs.
POST Rotterdam
Rotterdam

POST Rotterdam

POST Rotterdam

The POST Rotterdam project in the heart of the city center involves the renovation of one of the city’s most important historical buildings; the former main post office. Together with the adjacent town hall, it is one of the few buildings that remained standing after the bombing at the beginning of World War II. After a long period of vacancy, the national monument is now being fully restored.
Amsterdam

Amsterdam Court

Amsterdam Court

The new court in Amsterdam merges three worlds, which at the same time are to operate strictly separated: the judiciary, the detainees and the visitors. As partner of consortium NACH (New Amsterdam Court House), ABT signed on to design, build, finance, maintain and operate this imposing building on Parnassusweg in Amsterdam. It takes partnership to build an icon!
Scheveningen

Transformation of Hoog Lindoduin

Transformation of Hoog Lindoduin

The residential building Hoog Lindoduin was subjected to a major renovation and sustainability project commissioned by Vestia. The 182-unit gallery apartment was made gas-free and the living plan, comfort, sound insulation, fire safety and aesthetic appearance were greatly improved. The building was stripped down to the existing 1963 concrete shell, but the main load-bearing structure remained intact. ABT was integral technical consultant.
De Droogbak
Amsterdam

Renovation De Droogbak

Renovation De Droogbak

The majestic building De Droogbak is a real eye-catcher. It is also situated in an absolute prime location, directly west of Amsterdam’s Central Station. This beautiful 19th-century office building underwent a remarkable makeover in just a year and a half. ABT provided comprehensive construction and technical advice.
UNStudio / gemeente Nijmegen
Nijmegen

Revitalization of the Valkhof Museum

Revitalization of the Valkhof Museum

The Valkhof Museum in Nijmegen is being renovated. The building and the presentations of the collections will receive a future-proof and contemporary look. Many parts of the building require technical interventions due to changes in use, comfort, and security. ABT, working as an integral technical advisor, is closely collaborating with architect UNStudio on the design of the new museum.